YL/2021/04 Site Formation and Infrastructure Works for Yuen Long South First Phase Development
Client
Civil Engineering and Development Department CEDD
Main Contractor
CREC Joint Venture
Design Period
Jan 2024 to Current
Scope of Service
Alternative Design for Temporary Works
- Alternative Design for Traffic Deck at River
Contract No. YL/2021/04 Site Formation and Infrastructure Works for Yuen Long South First Phase Development - Contract 2
The works mainly include site clearance and formation (including land decontamination works); nullah deckings at various locations; construction of proposed Road D1, Road D2, Road L1A, Road L1B and slip road at the existing Shap Pat Heung Interchange; improvement to sections of existing Kung Um Road, Kiu Hing Road, Wong Nai Tun Tsuen Road, Lam Tai East Road, Tai Kei Leng Road, Tai Tong Road, Lam Hi Road, Lam Yu Road, Shap Pat Heung Road and Sham Cheung Road; construction of associated works including water mains, drainage works and sewerage systems, cycle tracks, footpaths, common utility tunnel, box culverts, junction improvement works, slope works, retaining walls, landscaping works, electrical and mechanical works and other ancillary works; and implementation of environmental mitigation measures (including noise semi-enclosures, noise barriers and low-noise road surfacing) and environmental monitoring works for the works mentioned above.
Main Contractor, CREC Joint Venture, appointed Fiable Design Consultant Limited to carry out alternative design to suit construction sequence.