Improvement Work for Tso Wan Pier

- Pre-construction Condition Survey

- Strengthening Work of the Existing Concrete Block to avoid further movement

- Temporary Working Platform for Pier Strengthening Works.

- Method Statement including Safety and Environmental Consideration

- Structural Assessment on the defect of the Reinforced Concrete Footbridge

- Temporary Working Platform for Repair Works of the Defect of Footbridge

Contract No. TW45 of 2022-23 Site Investigation for Improvement to Pier at Tso Wan, North Lantau, Tsuen Wan

The Main Contract by Home Affairs Department (HAD) is to provide Contactor's Design for strengthening the existing misaligned / displaced Tso Wan Pier.

Main Contractor, Chiu Kee Construction Engineering Company Limited, appointed Fiable Design Consultant Limited to provide engineering services on the improvement work to Tso Wan Pier.