ND/2019/04 Fanling Bypass Eastern Section (Shek Wu San Tsuen North to Lung Yeuk Tau)
Client
Civil Engineering and Development Department CEDD
Main Contractor
Daewoo - Chun Wo - Kwan Lee Joint Venture
Design Period
Jul 2023 to Current
Scope of Service
Design Optimization, Permanent and Temporary Work Design for Civil Project
- Cost Saving Design for Retaining Wall
- Alternative Design of ELS to facilitate site operation
- ELS Design for construction work of Bridge and U-trough
- Soil Platform for Lifting Crane for construction of Steel Footbridge and Piers
- Temporary Steel Bridge for Construction of Bridge and Pedestrian Diversion
Contract No. ND/2019/04 Fanling North New Development Area,
Phase 1: Fanling Bypass Eastern Section (Shek Wu San Tsuen North to Lung Yeuk Tau)
The contract mainly comprises construction of an approximately 2-kilometre-long dual two-lane Fanling Bypass Eastern Section between Shek Wu San Tsuen North and Lung Yeuk Tau comprising viaduct, at-grade road and underpass sections; construction of Lung Yeuk Tau Interchange connecting Fanling Bypass Eastern Section with existing Sha Tau Kok Road – Lung Yeuk Tau; construction of a footbridge across Ng Tung River and a cycle track cum footbridge over Lung Yeuk Tau Interchange; construction of a sewage pumping station adjacent to Lung Yeuk Tau Interchange; reprovisioning of the On Lok Mun Street Playground, public toilet and refuse collection point near Lung Yeuk Tau Interchange; road junction improvement works in the North District; and associated ground investigation, geotechnical instrumentation and monitoring, slope and retaining wall works, drainage and sewerage works, waterworks, noise barrier works, traffic control and surveillance system installation, electrical and mechanical works and landscaping works.
Daewoo - Chun Wo - Kwan Lee Joint Venture appointed Fiable Design Consultant Limited to provide Cost Saving Design on permanent retaining wall, Alternative Design on ELS sequence to facilitate site operation, ELS and site formation design for bridge and underground utilities construction, temporary steel bridge for bridge construction.