ND/2019/02 Roads and Drains between Kwu Tung North New Development Area and Shek Wu Hui

Client

Civil Engineering and Development Department CEDD

Main Contractor

Kwan Lee - Chun Wo Joint Venture

Design Period

Mar 2023 to Current

Scope of Service

Permanent and Temporary Work Design for Civil Project

- ELS Design for Jacking Pit and Receiving Pit

- Road Drainage Work along Sheung Yue River

- Pre-Construction Condition Survey Report

Contract No. ND/2019/02 Kwu Tung North New Development Area, Phase 1: Roads and Drains between Kwu Tung North New Development Area and Shek Wu Hui

The contract mainly comprises road and drainage works between Kwu Tung North New Development Area and Shek Wu Hui; construction of a sewage pumping station, a Long Valley Nature Centre and a footbridge spanning across Sheung Yue River; and site formation of land and the associated engineering infrastructure works for a village resite area in Kwu Tung North New Development Area.

Kwan Lee - Chun Wo Joint Venture appointed Fiable to design for road drainage works along Sheung Yue River, External and Lateral Support (ELS) with maximum 14.5mH retaining height for Pipe Jacking Works, Pre-construction Condition Surveyor at Lak Ma Chau MTR Spur Line.